watch now

Author Topic: Construction/Renovation Tipid Tips  (Read 192768 times)

arkin

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #240 on: February 26, 2014, 07:19:54 pm »
Usual rate i use per square meter is:

Fine to Medium - 15k (7k structural, 4k structural, 4k plumbing and electrical)

High End - 20k - 25k

Very high end can go up to 50k

bratty

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #241 on: February 26, 2014, 09:38:14 pm »
Thanks sis arkin. I assume Manila rate yan... Ang mahal! Hahaha!

bettyboop1322

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #242 on: February 27, 2014, 08:31:45 am »
i agree that high end ranges from 20-25k but still depends on your architectural/ aesthetic preferences.. yung finishing talaga ang nagpapamahal

arkin

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #243 on: February 27, 2014, 09:27:31 am »
Sa province makakatipid ka lang sa labor. Pero sa materials aside from gravel, sand and hollowblocks, mas mahal na halos lahat. Don't go for reinforcing bars na grade 33 (which are sold sa mga probinsya) unless you've consulted your structural designer

bratty

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #244 on: February 27, 2014, 09:32:03 am »
Thanks mga sis! :)

bettyboop1322

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #245 on: February 27, 2014, 09:42:10 am »
sa tingin pa lang malalaman mo na if sub-standard ang reinforcing bars na binibili mo... sub-standard china reinforcing bars somehow look pale and parang namumuti... and the lugs & ribs are not that smoothly carved...

mishyla

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #246 on: February 27, 2014, 04:38:03 pm »
hi mga sis, just to update, we started the renovation end of Nov. we opted arawan compared to pakyawan. We tried pakyawan when we had our 4th floor bathroom built, it was a mess (maybe bec. we didn't really check the works and what not, plus the materials, parang whirlwind lahat. So now, Arawan na lang, we have 3 skilled, (1 foreman --as in alam niya halos lahat, 2 skilled) = 500 each, then laborer na 2 (250 each) minsan 1 lang, depende sa dami ng ipapagawa.

Yung house namin, built na, we just had the  1st and 2nd floor renovated. now nasa 1st floor na sila, matagal kung titignan mo kasi ilang months na, now kasi may pagka OC na talaga kami, every detail dapat maayos. ayaw namin yung bara bara work lang. so pulido sila, and kasi kokonti lang din sila kaya understandable din yung tagal, plus andami din talaga ginawa sa 2nd floor namin, like parang buong floor, tinibag mga walls, nag re-walling, buhos, extend and so on. so far medyo malaki laki na din nagagastos namin, labor and materials. lalo na sa materials, mga fixtures, kaloka na sa mahal, lalo na mga kilalang brand.

TIP:
** mas mura sa local hardwares like sa mga kanto kanto compared to Wilcon (in terms of plywood, kahoy, cement, and others) downside lang kasi minsan sa hardware, cash lang talaga so if you want to use CC, sa wilcon or other HW Depot stores bibili
** comparing the price of the items we bough from Wilcon and CW Home Depot, mas mura sa home depot.
** tiles -- we have this certail design ng 60x60 tiles that we sa from Tile Center, 198 each. sa Wilcon 205 each, sa Home Depot 195 lang.  Carpet vinyl tile (yung parang sa office) 255 sa Wilcon , 195 sa Home depot.


babiebrat26

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #247 on: May 13, 2014, 11:27:12 am »
hi ladies and gents.. ask ko lang how much sa tingin nyo magagastos namin pag ang ipapa gawa ko is change ng tiles sa buong floor and cr. 38 sqm. lang yun condo. and paint?? wala akong idea kasi??  san amay mag reply sorry (out of the topic). :)

mrscardenas2011

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #248 on: June 26, 2014, 10:38:27 am »
^grabeng mahal pala magpapalit ng bubong!  :o

bratty

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #249 on: June 26, 2014, 11:51:56 am »
Oo sis. Di mo din pwede tipirin ang bubong kasi tag-araw man o tag-ulan, isa yan sa mag-protect sa inyo. Para sa akin, pwede ka magtipid sa finishing pero wag sa mga structural. Sasakit lang ulo mo.

I also agree on the 3-quote rule.

lilstar

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #250 on: June 26, 2014, 01:12:38 pm »
^ Sis pwede ko ba malaman ilang sqm ang pinapabubungan nyo and what type ng bubong na yun? ako kasi wala na talaga budget sa construction pero gsuto ko sana unti-untiin. Since tapos na kami sa foundation at walls, gusto ko isunod ang roof., Tama ba ako sa desisyon ko? feeling ko kasi maluluma lang yung pader pag walang roof. Please help. Thanks in advance!

Btw, 50-60sqm lang yung floor area namin, how much kaya ang magagastos ko if basic roofing lang. Thanks a lot!

ennaer

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #251 on: July 28, 2014, 04:50:53 pm »
^^^^sis, nagpaquote halos same price ng nabanggit mo, pero trusses pa lang siya. wala pang bubong.
Yung sayo kumpleto na pati bubong jan?

det060403

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #252 on: August 13, 2014, 01:16:49 pm »
Girls, ano bang mas okay sa roofing kung let's say sa porch or sa may terrace, para sa modern design na house, minimalist as much as possible... rafter ba o truss? tsaka which is cheaper kaya?

mrscardenas2011

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #253 on: August 13, 2014, 06:27:06 pm »
^for me trusses if you dont have plans to extend the main house in the future.

det060403

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #254 on: August 13, 2014, 06:41:24 pm »
no plans naman pa of any extensions. Masyado ng masikip! i think matibay naman ang trusses because of the structure atsaka kung steel trusses gagamitin, iniisip ko lang din kasi yung design kung babagay, we'll talk it out. hmm... anyhoo, thanks leigh

mrscardenas2011

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #255 on: August 14, 2014, 02:13:43 pm »
Pinaka okay yung 2600 per sheet, makapal and sabi, hindi daw nababali or nabubutas. Tinupi tupi pa nung salesman, hindi nga napunit. :D
« Last Edit: October 09, 2014, 02:27:37 pm by mrscardenas2011 »

det060403

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #256 on: August 14, 2014, 05:52:42 pm »
^Gusto ko nga sana parang rafter trellis kaya lang debate kami sa polycarb kasi nung bumagyo yung mga polycarb ng kapitbahay nagliparan! Pero kasi mas nagagandahan ako sa ganon kaya nagpapadesign nalang ako sa architect/interior designer ng mas babagay sa bahay. Hangggang ngayon hindi pa din kami nagkakasundo ng designer hehe...
Hindi pa namin afford pabubungan yung terrace, yun kasi ang balak niyang ipaextend tsk! kaya yung sa baba nalang muna yung plan namin as of now

gorgeous_me

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #257 on: September 18, 2014, 11:32:04 am »
mga sisies, ask ko lang, yung sa construction/renovation, meron ba dito nagloan sa bank or pag-ibig?

how much ba ang pinakamataas na pwede i-loan

hindi ko sure kung renovate pa yung amin, or contruction na, kung babaguhin lahat

and need ba ng downpayment? or hindi naman required? and pano yung bigayan ng loan? isang bagsakan ba?

sorry daming tanong

bluish_mommy

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #258 on: September 19, 2014, 09:07:31 am »
^sis, yung lot ang ginawa naming collateral. inappraise ng bank yung property + yung sinubmit naming design ng house with complete BOMs, signed and sealed (by the engineers)... 80% of both the appraised value ng lot + yung complete construction cost based from BOMs.

hindi isang bagsakan ang bigay, depende sa progress, 0% muna, then 20% and so on. yung ibang banks 0, 30% etc.

dapat may extra kang pera na pang-abono talaga para matarget mo yung progress nya, otherwise the bank will not give you the remaining money.

gorgeous_me

  • Guest
Re: Construction/Renovation Tipid Tips
« Reply #259 on: September 19, 2014, 11:33:51 am »
^ahh, ganon ba, thanks sis :)

yun nga din, kapag walang extra money, bakande pa matapos yung bahay, kakaintay sa loan na hindi naman pa ibibigay, hehe

thanks sis

how much pala yung mga papa-sign ka sa engineers?
yung BOM ba, kasama na din don yung design?

 

Latest Stories

Load More Stories
Close